More door to door and sign posting
A visit to Kildare Towers

Paving done on Kildare Road and Rembrandt

The city has undertaken some work on Kildare Road near Rembrandt. This included two solid days of paving. A number of small ditches were filled with over 10 tons of asphalt. It was done with a tar adhesive and a cold patch. This objective was to fill pot holes and street irregularities and it  should minimize vibrations following the water main breaks exprienced last winter. It is an interim measure since a large strip of Kildare Road will be fitted with brand new piping. Work is also finished on the repaving of  the street and sidewalks on Sir Walter Scott. Line painting will take place this week.

Comments

Feed You can follow this conversation by subscribing to the comment feed for this post.

Verify your Comment

Previewing your Comment

This is only a preview. Your comment has not yet been posted.

Working...
Your comment could not be posted. Error type:
Your comment has been posted. Post another comment

The letters and numbers you entered did not match the image. Please try again.

As a final step before posting your comment, enter the letters and numbers you see in the image below. This prevents automated programs from posting comments.

Having trouble reading this image? View an alternate.

Working...

Post a comment

Your Information

(Name and email address are required. Email address will not be displayed with the comment.)